A typical Dallas-Fort Worth roof replacement of 20 to 30 squares of asphalt shingles fits White Rock’s single 16-foot roll-off with a disposal allowance sized for roofing, and larger roofs get a swap on the second day.
This guide is for the homeowner or roofer planning the debris side of a re-roof: how much the tear-off weighs, how to count squares and layers, where the container goes, and how delivery and pickup line up with the crew.
Why shingles fill a container by weight first
Asphalt shingles are dense. The US EPA’s Volume-to-Weight Conversion Factors (April 2016) lists composition roofing and other asphalt roofing at 731 pounds per cubic yard. That puts a 16-by-8-by-5-foot container filled to the rail with shingles at roughly 7 tons, more than most other debris a house produces.
| Material (EPA category) | Pounds per cubic yard | Weight of 10 cubic yards |
|---|---|---|
| Composition roofing | 731 | 7,310 lb (3.7 tons) |
| Clean engineered wood (decking) | 268 | 2,680 lb (1.3 tons) |
| Other ferrous metal (gutters, flashing) | 225 | 2,250 lb (1.1 tons) |
| Clean dimensional lumber (fascia, rafters) | 169 | 1,690 lb (0.8 tons) |
That is why every roofing rental is quoted with a tonnage allowance sized for shingles. The box has room left over long before the weight is used up, and the honest way to handle a big roof is a second container, not a taller pile.
Estimating squares and layers
A roofing square is 100 square feet of roof surface. Your roofer’s bid or measurement report states the job in squares, and that number plus the layer count is what we need to plan the container.
If you are estimating before a bid, the roof surface is larger than the home’s footprint because of pitch and overhang. Multiply the footprint plus eaves by a pitch factor (about 1.12 for a 6-in-12 roof, 1.20 for 8-in-12), then divide by 100.
Connecticut’s environmental agency gives asphalt shingles a weight of 175 to 233 pounds per square. Applied to common DFW roof sizes, with volume from the EPA factor above:
| Roof size | One layer, weight | One layer, volume | Two layers, weight |
|---|---|---|---|
| 15 squares | 2,625 to 3,495 lb | 3.6 to 4.8 cu yd | 5,250 to 6,990 lb |
| 20 squares | 3,500 to 4,660 lb | 4.8 to 6.4 cu yd | 7,000 to 9,320 lb |
| 25 squares | 4,375 to 5,825 lb | 6.0 to 8.0 cu yd | 8,750 to 11,650 lb |
| 30 squares | 5,250 to 6,990 lb | 7.2 to 9.6 cu yd | 10,500 to 13,980 lb |
| 40 squares | 7,000 to 9,320 lb | 9.6 to 12.8 cu yd | 14,000 to 18,640 lb |
Those figures are for shingles alone. Real tear-off is loose, not stacked, and it brings felt underlayment, ridge caps, starter strips, and any decking that has to come off. The Connecticut page breaks shingle waste down further: tear-off shingles make up 85 to 90 percent of the weight and nails under 1 percent.
The practical rules:
- Up to about 30 squares, one layer: one container with a roofing allowance.
- Over 30 squares: plan a swap for the second day so the crew never waits on an empty box.
- Two or more layers, or a lot of rotted decking: tell us when you book. The extra weight is what decides whether a swap belongs in the plan.
Placing the container near the eaves
Roofers drop tear-off straight from the roof edge into the box, so the best spot is the stretch of driveway closest to the eave line on the side of the house with the most roof area. Every foot between the drip edge and the container is a foot of debris carried, slid down a chute, or dropped on landscaping.
What placement needs:
- A 16-by-8-foot footprint plus straight-line clearance for the truck to back in and roll the container off. A standard two-car drive fits it with room beside it.
- Boards under the rollers. Every residential drop sits on wood boards to keep the steel off concrete, pavers, or asphalt.
- Clear overhead space. Low branches and wires over the drive change where the driver can set it. Attach a photo to the quote form if the approach is tight.
- Vehicles moved out of the driveway on delivery morning.
If the only workable spot is the street or alley, most DFW cities require a right-of-way permit first. The dumpster permit guide for Dallas and Fort Worth covers how that works, and we flag it before delivery.
The roofing crew usually tarps beds and shrubs along the drop line. Ask about the strip of lawn or bed between the eave and the container, since that is where stray debris lands.
Timing delivery with the crew
Roofing containers are delivered the morning of tear-off, or the afternoon before when the crew starts at first light, and picked up the day the crew finishes. Give us the roofer’s start date when you book and we schedule around it.
| Day | Container | Crew |
|---|---|---|
| Delivery (morning of, or afternoon before) | Set on boards near the eaves | Tarps landscaping |
| Tear-off day | Fills with shingles and felt | Strips and drops debris |
| Day 2 on a large roof | Swap: full box hauled, empty one set in the same spot | Finishes tear-off, replaces decking |
| Final day | Picked up after the last debris goes in | Dries in, shingles, magnet sweep |
Swaps requested by early afternoon are usually done the same day on most DFW routes, otherwise the next business morning. Roofers with recurring jobs can set up a contractor account with one dispatcher for every site.
DFW’s storm calendar affects roofing schedules. The National Weather Service in Fort Worth notes that large hail, damaging winds, flooding, and tornadoes occur nearly every year somewhere in the Metroplex, and that thunderstorms and severe weather peak in spring. After a hail event, book the container as soon as the roofer gives you a start date.
Nails and cleanup
A tear-off scatters nails. Most land in the container, where they are fine. The rest end up in the lawn, beds, and driveway, and the roofing crew’s magnet sweep is the standard fix. Ask the crew to run it around the container spot and the truck’s path too.
Load the box so it can travel:
- Spread shingles front to back across the floor instead of piling them under one eave. A lopsided load is harder to roll onto the truck.
- Lay decking and gutters flat on top of the shingle layer.
- Stop at the top rail. The load has to be tarped for the drive to disposal, and nothing can stick up past the walls.
What doesn’t go in the box
Most roofing debris is fine: shingles, felt and synthetic underlayment, decking, fascia, drip edge, flashing, gutters, vents, and the packaging from the new materials. A few things stay out:
| Item | Why |
|---|---|
| Open cans of roofing cement, sealant, or primer | Liquid and chemical waste; dried, empty cans are fine |
| Solvents and wet paint from fascia or trim work | Chemical waste |
| Propane cylinders from torch-down work | Pressurized fuel tank |
| Roofing that tested positive for asbestos | Regulated material, not accepted |
Asbestos is rare in shingle tear-off. The Connecticut page cites CalRecycle that the incidence of asbestos-containing shingles in tear-offs today is “extremely low.” If testing finds it, that material is handled by a licensed abatement contractor, not a roll-off. The full list is in what can’t go in a dumpster in DFW.
How White Rock can help
We deliver the 16-foot roll-off on boards to driveways across Dallas, Fort Worth, and the rest of DFW, timed to your roofer’s start date, with one flat rate that includes delivery, pickup, the rental period, and a disposal allowance sized for shingles. Tell us the squares and layers and we will say whether one container covers it or a second-day swap belongs in the plan. See roll-off dumpster rentals or book a delivery date.

