Project guides

Roof Replacement Debris in DFW: Dumpster Planning Guide

In DFW, a 20 to 30 square shingle tear-off fits one 16-foot roll-off with a roofing weight allowance; larger roofs get a swap on the second day.

By White Rock Waste Solutions ·

A typical Dallas-Fort Worth roof replacement of 20 to 30 squares of asphalt shingles fits White Rock’s single 16-foot roll-off with a disposal allowance sized for roofing, and larger roofs get a swap on the second day.

This guide is for the homeowner or roofer planning the debris side of a re-roof: how much the tear-off weighs, how to count squares and layers, where the container goes, and how delivery and pickup line up with the crew.

Why shingles fill a container by weight first

Asphalt shingles are dense. The US EPA’s Volume-to-Weight Conversion Factors (April 2016) lists composition roofing and other asphalt roofing at 731 pounds per cubic yard. That puts a 16-by-8-by-5-foot container filled to the rail with shingles at roughly 7 tons, more than most other debris a house produces.

Material (EPA category) Pounds per cubic yard Weight of 10 cubic yards
Composition roofing 731 7,310 lb (3.7 tons)
Clean engineered wood (decking) 268 2,680 lb (1.3 tons)
Other ferrous metal (gutters, flashing) 225 2,250 lb (1.1 tons)
Clean dimensional lumber (fascia, rafters) 169 1,690 lb (0.8 tons)

That is why every roofing rental is quoted with a tonnage allowance sized for shingles. The box has room left over long before the weight is used up, and the honest way to handle a big roof is a second container, not a taller pile.

Estimating squares and layers

A roofing square is 100 square feet of roof surface. Your roofer’s bid or measurement report states the job in squares, and that number plus the layer count is what we need to plan the container.

If you are estimating before a bid, the roof surface is larger than the home’s footprint because of pitch and overhang. Multiply the footprint plus eaves by a pitch factor (about 1.12 for a 6-in-12 roof, 1.20 for 8-in-12), then divide by 100.

Connecticut’s environmental agency gives asphalt shingles a weight of 175 to 233 pounds per square. Applied to common DFW roof sizes, with volume from the EPA factor above:

Roof size One layer, weight One layer, volume Two layers, weight
15 squares 2,625 to 3,495 lb 3.6 to 4.8 cu yd 5,250 to 6,990 lb
20 squares 3,500 to 4,660 lb 4.8 to 6.4 cu yd 7,000 to 9,320 lb
25 squares 4,375 to 5,825 lb 6.0 to 8.0 cu yd 8,750 to 11,650 lb
30 squares 5,250 to 6,990 lb 7.2 to 9.6 cu yd 10,500 to 13,980 lb
40 squares 7,000 to 9,320 lb 9.6 to 12.8 cu yd 14,000 to 18,640 lb

Those figures are for shingles alone. Real tear-off is loose, not stacked, and it brings felt underlayment, ridge caps, starter strips, and any decking that has to come off. The Connecticut page breaks shingle waste down further: tear-off shingles make up 85 to 90 percent of the weight and nails under 1 percent.

The practical rules:

  • Up to about 30 squares, one layer: one container with a roofing allowance.
  • Over 30 squares: plan a swap for the second day so the crew never waits on an empty box.
  • Two or more layers, or a lot of rotted decking: tell us when you book. The extra weight is what decides whether a swap belongs in the plan.

Placing the container near the eaves

Roofers drop tear-off straight from the roof edge into the box, so the best spot is the stretch of driveway closest to the eave line on the side of the house with the most roof area. Every foot between the drip edge and the container is a foot of debris carried, slid down a chute, or dropped on landscaping.

What placement needs:

  • A 16-by-8-foot footprint plus straight-line clearance for the truck to back in and roll the container off. A standard two-car drive fits it with room beside it.
  • Boards under the rollers. Every residential drop sits on wood boards to keep the steel off concrete, pavers, or asphalt.
  • Clear overhead space. Low branches and wires over the drive change where the driver can set it. Attach a photo to the quote form if the approach is tight.
  • Vehicles moved out of the driveway on delivery morning.

If the only workable spot is the street or alley, most DFW cities require a right-of-way permit first. The dumpster permit guide for Dallas and Fort Worth covers how that works, and we flag it before delivery.

The roofing crew usually tarps beds and shrubs along the drop line. Ask about the strip of lawn or bed between the eave and the container, since that is where stray debris lands.

Timing delivery with the crew

Roofing containers are delivered the morning of tear-off, or the afternoon before when the crew starts at first light, and picked up the day the crew finishes. Give us the roofer’s start date when you book and we schedule around it.

Day Container Crew
Delivery (morning of, or afternoon before) Set on boards near the eaves Tarps landscaping
Tear-off day Fills with shingles and felt Strips and drops debris
Day 2 on a large roof Swap: full box hauled, empty one set in the same spot Finishes tear-off, replaces decking
Final day Picked up after the last debris goes in Dries in, shingles, magnet sweep

Swaps requested by early afternoon are usually done the same day on most DFW routes, otherwise the next business morning. Roofers with recurring jobs can set up a contractor account with one dispatcher for every site.

DFW’s storm calendar affects roofing schedules. The National Weather Service in Fort Worth notes that large hail, damaging winds, flooding, and tornadoes occur nearly every year somewhere in the Metroplex, and that thunderstorms and severe weather peak in spring. After a hail event, book the container as soon as the roofer gives you a start date.

Nails and cleanup

A tear-off scatters nails. Most land in the container, where they are fine. The rest end up in the lawn, beds, and driveway, and the roofing crew’s magnet sweep is the standard fix. Ask the crew to run it around the container spot and the truck’s path too.

Load the box so it can travel:

  1. Spread shingles front to back across the floor instead of piling them under one eave. A lopsided load is harder to roll onto the truck.
  2. Lay decking and gutters flat on top of the shingle layer.
  3. Stop at the top rail. The load has to be tarped for the drive to disposal, and nothing can stick up past the walls.

What doesn’t go in the box

Most roofing debris is fine: shingles, felt and synthetic underlayment, decking, fascia, drip edge, flashing, gutters, vents, and the packaging from the new materials. A few things stay out:

Item Why
Open cans of roofing cement, sealant, or primer Liquid and chemical waste; dried, empty cans are fine
Solvents and wet paint from fascia or trim work Chemical waste
Propane cylinders from torch-down work Pressurized fuel tank
Roofing that tested positive for asbestos Regulated material, not accepted

Asbestos is rare in shingle tear-off. The Connecticut page cites CalRecycle that the incidence of asbestos-containing shingles in tear-offs today is “extremely low.” If testing finds it, that material is handled by a licensed abatement contractor, not a roll-off. The full list is in what can’t go in a dumpster in DFW.

How White Rock can help

We deliver the 16-foot roll-off on boards to driveways across Dallas, Fort Worth, and the rest of DFW, timed to your roofer’s start date, with one flat rate that includes delivery, pickup, the rental period, and a disposal allowance sized for shingles. Tell us the squares and layers and we will say whether one container covers it or a second-day swap belongs in the plan. See roll-off dumpster rentals or book a delivery date.

Sources

  1. US EPA: Volume-to-Weight Conversion Factors (April 2016)
  2. Connecticut DEEP: Asphalt Roofing Shingle Recycling
  3. National Weather Service Fort Worth: Dallas/Fort Worth Climate Narrative
FAQ

Questions about this guide

Didn’t find your answer? A dispatcher picks up Mon–Fri 8am–6pm, Sat 8am–1pm CT.

or send the details with photos →Browse every question we get asked →
01How much does one square of asphalt shingles weigh?
Connecticut's environmental agency puts asphalt shingles at 175 to 233 pounds per square, meaning 100 square feet of new shingles. Tear-off debris also carries felt, nails, and whatever moisture the roof held, so plan from the top of that range. Heavier architectural and impact-rated products land at the high end.
02Does a second layer of shingles change the dumpster plan?
Yes. Two layers means roughly twice the shingle weight for the same roof area, which can put a roof under 30 squares past one container's roofing allowance. Count the layers at a cut edge or vent boot, or ask the roofer, and tell us when you book so the allowance and any swap are planned before tear-off day.
03Can rotted roof decking go in the same container as the shingles?
Yes. Decking, fascia, and drip edge are ordinary construction debris and go in with the shingles. The EPA table lists engineered wood at 268 pounds per cubic yard, far lighter than shingles, but a dozen sheets take real space, so load them flat on top of the shingle layer and mention the likely sheet count when you book.
04Can old gutters, flashing, and metal vents go in the roll-off?
Yes. Gutters, flashing, drip edge, vent caps, and turbine vents are accepted with the roofing debris. Lay long gutter runs flat along the length of the box instead of standing them on end, so nothing sticks up past the top rail when the load is tarped.
05Who picks up the stray roofing nails in the yard and driveway?
The roofing crew, as part of its own cleanup, usually with a rolling magnet across the lawn, beds, and driveway. Nails that land in the container are fine and travel with the load. Ask your roofer to run the magnet around the container spot too, since nails dropped beside the box are easy to miss once it is hauled.
Ready when you are

Book the truck or the box online

Pick a date on the live calendar, or call dispatch at (945) 334-3228 and describe the job.

Get in touch

Schedule online or send us the details

Know what you need? Pick a date and time from the live calendar. Want a number first? Send the details. We respond within 15 minutes during staffed business hours.

  1. Response within 15 minutesDuring staffed business hours. A real dispatcher, not an auto-responder.
  2. You get one flat numberMost jobs are quoted from your description and a few photos. No site visit, no hourly billing, no dump fees added later.
  3. Pick your date and timeApprove the price and choose a date and a two-hour arrival window from the live calendar. The crew calls when they are on the way.

Request a quote or proposal

Photos (optional, up to 3)

A few photos help us quote a flat price without a site visit.

By submitting, you agree to be contacted about your request. We never sell or share your information.